Ensure that 735 branches in 9 countries receive the new, branch-specific POS package every 2 – 3 weeks and ensure that incoming roll containers can be cross-docked directly.

APPROACH

  • Process optimization realized and communication with DC fully taken over.
  • Roll container packaging developed so that it can be delivered with minimal damage.
  • Delivery process optimized to DC.

RESULTS

  • Leadtime shortened by 2 weeks.
  • 125K savings per year on packaging materials.
  • 20% saving on in-store installation hours by minimizing packaging materials.
  • Saving of 2 FTEs in retailer’s marketing department.